Planning of Rail Bridges on Katra Quazigund Railway line in Jammu & Kashmir

 Planning of Rail Bridges on Katra Quazigund Railway line in Jammu & Kashmir
Auteur(s):
Présenté pendant IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, publié dans , pp. 510-511
DOI: 10.2749/weimar.2007.0575
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.2 MB

Katra to Quazigund portion of 287 km long Udhampur-Srinagar-Baramulla rail New Rail Link Project (USBRL) in State of Jammu & Kashmir, India, covering 142 km stretch is located in rugged Himalayan M...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Publié dans:
Page(s): 510-511 Nombre total de pages (du PDF): 10
Page(s): 510-511
Nombre total de pages (du PDF): 10
Année: 2007
DOI: 10.2749/weimar.2007.0575
Abstrait:

Katra to Quazigund portion of 287 km long Udhampur-Srinagar-Baramulla rail New Rail Link Project (USBRL) in State of Jammu & Kashmir, India, covering 142 km stretch is located in rugged Himalayan Mountains. The alignment traverses geologically young Himalayas through active land slide zones and tectonically complicated geological conditions due to presence of Main Boundary Thrust. Main Boundary Thrust has been responsible for an earthquake of magnitude 7.6 on Richter scale in Oct 2005, with epicenter about 150 km away from site resulting in loss of more than 75000 lives. Owing to poor geological formations and difficult terrain, more than 73% of alignment passes through tunnels and further 10% portion of alignment on bridges or viaducts.

Planning & Design of bridges for rail alignment crossing deep valleys with steep unstable slopes is a daunting task. The curved rail alignment alongwith unstable, young geological formations, coupled with severe seismicity of area pose unique challenges while deciding upon the bridge configurations. The paper highlights various considerations in choosing bridge structural alternatives/configurations and materials for crossing such a difficult terrain.

Mots-clé:
superstructure piles et culées