Planning, Design and Construction of Elevated Guideway of Kelana Jaya (KLJ LRT) Extension Project and Challenges & Lessons Learnt

 Planning, Design and Construction of Elevated Guideway of Kelana Jaya (KLJ LRT) Extension Project and Challenges & Lessons Learnt
Auteur(s): , ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 259-266
DOI: 10.2749/kualalumpur.2018.0259
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.27 MB

Building a transportation infrastructure for fast growing city like Petaling Jaya (considered twin city with Kuala Lumpur), Malaysia is always challenging and difficult works. One of the major infr...
Lire plus

Détails bibliographiques

Auteur(s): (Minconsult Sdn Bhd)
(Minconsult Sdn Bhd)
(Minconsult Sdn Bhd)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 259-266 Nombre total de pages (du PDF): 8
Page(s): 259-266
Nombre total de pages (du PDF): 8
DOI: 10.2749/kualalumpur.2018.0259
Abstrait:

Building a transportation infrastructure for fast growing city like Petaling Jaya (considered twin city with Kuala Lumpur), Malaysia is always challenging and difficult works. One of the major infrastructure projects, the 17 km long elevated guideway which form the extension of Kelana Jaya Light Rail Transit (KLJ LRT) i.e Putra line is opened for service since 30th June 2016. The elevated viaduct was designed to build extensively using precast technique. The time efficient proven technique of span by span precast segmental construction along with some crossings with precast balanced cantilever construction was implemented for the project. Cast-in-situ box girder and precast U-beams with in-situ deck were also used for bifurcation and pocket track areas. Majority of the stations (9 out of 12) for KLJ LRT Extension are island platform stations and this has major impacts on interface in constructions, time and cost. The requirement of island platform station was one of the main criteria for the operator i.e RapidKL which is part of Prasarana.

Curved and skewed alignment over major 6 lanes highways and commuter lines necessitates a span as large as 100 m with 3 span balanced cantilever structure. Prestressed pier column were introduced due to space constraint. Precast split segments were also introduced to overcome difficulties in handling and delivery of deeper segments.

This paper describes the design scheme and contractual set up of guideway structures and presents an overview of construction and also related issues, incidents etc.

Mots-clé:
poutre de lancement