Performance-based assessment of Nahr Al-Fidar bridge
|
Détails bibliographiques
Auteur(s): |
Nisrine Makhoul
(Notre Dame University, Louaize, Lebanon)
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019 | ||||
Publié dans: | IABSE Symposium Guimarães 2019 | ||||
|
|||||
Page(s): | 1237-1242 | ||||
Nombre total de pages (du PDF): | 6 | ||||
DOI: | 10.2749/guimaraes.2019.1237 | ||||
Abstrait: |
Nahr Al-Fidar Bridge is in Fidar village, which is located near Byblos City, Lebanon. The bridge reconstruction was carried out swiftly during 2006-2007, due to its importance as a vital commercial artery. Indeed, no traffic disruption is allowed on the bridge, since it leads to great economic losses. At the time being, even though the bridge has only accomplished about 10 years of its service life, it is being overloaded. The paper aims to assess the performance of Nahr Al-Fidar bridge. To that purpose, first, the case bridge is introduced, and a visual inspection took place to identify current the state of the bridge. Second, the performance indicators are evaluated for this bridge, by means of the visual assessment, and the key performance indicators are assessed. The aim is to check if the bridge meets the pre-specified performance goals. Finally, a quality control plan is implemented for Nahr Al-Fidar bridge. |
||||
Mots-clé: |
pont
|