Panama Canal expansion project – description third set of locks project
|
Détails bibliographiques
Auteur(s): |
Rüdiger Spengler
Jesús Imedio Rafael Pérez Federico Casanova |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 783-790 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814066889 | ||||
Abstrait: |
The construction of the third set of lock sets is part of the expansion program of the Panama Canal. Aim of the program is to allow longer and higher loaded vessels to transit the existing canal. The main components of the expansion program are:
|