0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Optimization Research of Construction Inventory Management on Site Based on Inventory Theory

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Publié dans:
Page(s): 1321-1325
DOI: 10.4028/www.scientific.net/AMM.209-211.1321
Abstrait:

Inventory management is to improve economic benefit of project procurement management by means of dominating order cycle and order quantity to minimize the stocks and total cost under the circumstance of normal construction.Firstly,inventory management involves material order,and contractors need to calculate parameters such as order cycle,order fee,order quantity,stocks fee,order lead time and safe stocks in order to make the total inventory fee minimized during construction.This article applies one branch of operations research--"inventory" to optimize the inventory management.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.4028/www.scientific.net/AMM.209-211.1321.
  • Informations
    sur cette fiche
  • Reference-ID
    10327231
  • Publié(e) le:
    24.07.2019
  • Modifié(e) le:
    24.07.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine