0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Publié dans:
Page(s): 1359-1362
DOI: 10.4028/www.scientific.net/AMM.209-211.1359
Abstrait:

The construction drawing is a design document by which each construction party should abide. It is also a key element to affect construction project quality. So in the stage of supervision, the important thing that management engineers must grasp is blueprint-auditing. They should grasp the auditing principle, auditing method, auditing content and results,through which the problems existed among design, construction, process, engineering materials, equipments, etc. as well as those in each profession can be timely discovered. Through which, most design problems can be resolved before construction and the quality accident can be removed at its initial point. As a result, the construction time and cost can be saved a lot.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.4028/www.scientific.net/AMM.209-211.1359.
  • Informations
    sur cette fiche
  • Reference-ID
    10327238
  • Publié(e) le:
    24.07.2019
  • Modifié(e) le:
    24.07.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine