The New Storstrøm Bridge – Pier Design
|
Détails bibliographiques
Auteur(s): |
Mike Needham
(Ramboll)
James Collins (Ramboll) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022 | ||||
Publié dans: | IABSE Symposium Prague 2022 | ||||
|
|||||
Page(s): | 104-111 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/prague.2022.0104 | ||||
Abstrait: |
The New Storstrøm Bridge in Denmark has 40 concrete piers ranging from 18 to 35m high. The piers comprise multi-faceted stems and pier heads. To simplify offshore construction a precast segmental solution was used, with a prestressed insitu pier head. The design was optimised through parametric analysis including non-linear modelling and automated calculation reporting. A modular approach maximised repetition of segments between different pier heights to enable precast construction in a factory environment prior to assembly offshore. Non-linear dynamic modelling was used to validate resistance to ship impact. Detailed analysis of the insitu joints between segments was undertaken, using headed bars to provide the required anchorages. The pier head was designed using finite element models to confirm the strut and tie behaviour and a prestress layout that minimised external pockets. |
||||
Copyright: | © 2022 International Association for Bridge and Structural Engineering (IABSE) | ||||
License: | Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits. |