0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

New Accelerated Prefab Bridge Scheme – the NRW Bridge Modules

 New Accelerated Prefab Bridge Scheme – the NRW Bridge Modules
Auteur(s): , ,
Présenté pendant IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, publié dans , pp. S17-33
DOI: 10.2749/nantes.2018.s17-33
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.29 MB

Arup had been commissioned with the design of a new modular bridge system by Straßen.NRW, the road authority of Germany’s biggest state North Rhine-Westphalia. This article describes the background...
Lire plus

Détails bibliographiques

Auteur(s): (Arup Deutschland GmbH, Dusseldorf, Germany)
(Arup Deutschland GmbH, Dusseldorf, Germany)
(Arup Deutschland GmbH, Dusseldorf, Germany)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Publié dans:
Page(s): S17-33 Nombre total de pages (du PDF): 8
Page(s): S17-33
Nombre total de pages (du PDF): 8
DOI: 10.2749/nantes.2018.s17-33
Abstrait:

Arup had been commissioned with the design of a new modular bridge system by Straßen.NRW, the road authority of Germany’s biggest state North Rhine-Westphalia. This article describes the background of this pilot project, the design concept, as well as the structural design and construction sequence of two new bridges, which can be erected within 8-10 weeks. The design is characterized by a high degree of prefabrication, modularity as well as the use of high performance concrete to ensure an excellent durability. The bridges are designed as integral frames – spanning about up to 30 m. The use of in-situ concrete had been kept to a minimum. The structures contain no bearings, no expansion joints and no separate parapets, which significantly reduces lifecycle costs. The use of high performance concrete made an additional waterproofing layer obsolete, which also saves construction time. The bridges are designed for replacement of deficient structures. To minimize demolition time, the foundations were designed so the existing foundations could remain in place.