Monitoring of a Large Extradosed Bridge in Thailand – Lessons Learned
|
Détails bibliographiques
Auteur(s): |
Roman Geier
(Schimetta Consult ZT GmbH Vienna, Austria)
Thomas Mack (Schimetta Consult ZT GmbH Linz, Austria) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023 | ||||
Publié dans: | IABSE Symposium Istanbul 2023 | ||||
|
|||||
Page(s): | 775-782 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2023 | ||||
DOI: | 10.2749/istanbul.2023.0775 | ||||
Abstrait: |
To the north of Bangkok (Thailand), a new motorway section has been realized in recent years to relieve the surrounding routes in Nonthaburi Province, whose main characteristic is an extradosed bridge over the Chao Phraya river with a total length of 460 m. The building consists of two pylons with golden dome and 96 stay cables carrying a box girder cross-section designed for six lanes across the river. To monitor the structural behavior of the bridge an extensive monitoring system was awarded by the client to DYWIDAG Systems International GmbH in cooperation of Schimetta Consult who have optimized, designed and realized the system. In total 45 sensors are monitoring permanently temperatures, strains and deflections of the bridge, inclinations of the pylons, movements of the expansion joints, wind velocities, accelerations and cable forces. The data are automatically stored on site, provided via a UMTS connection to an external server within a few minutes, enabling continuous display of the signals on a homepage for easy access by the client In addition, the measurement data are being summarized on a half-year base and the results are submitted to the clients by a measurement report. The monitoring system is continuously acquiring data since opening of the structure to regular traffic, enabling a very good insight to the structural behavior. |
||||
Mots-clé: |
pont extradossé
|