0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mechanism Study of Conflict Analysis and Countermeasure about BOT Project Organization

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Publié dans:
Page(s): 1429-1432
DOI: 10.4028/www.scientific.net/AMM.209-211.1429
Abstrait:

This paper analyzes BOT project for its basic operational procedures and organizational structure. Conflict of BOT project organization is divided into two levels. On this basis, respectively, to the general contractor and the project company as its core, described main task undertaken by the project stakeholders. It establishes a knowledge-based difference, the two-level model for organizational conflict of BOT projects.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.4028/www.scientific.net/AMM.209-211.1429.
  • Informations
    sur cette fiche
  • Reference-ID
    10327251
  • Publié(e) le:
    24.07.2019
  • Modifié(e) le:
    24.07.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine