Managing data workflow from concept to commission – BIM for bridges
|
Détails bibliographiques
Auteur(s): |
Jean-Pierre Chanard
(Bentley Systems, Paris, France)
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Publié dans: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Page(s): | S5-143 | ||||
Nombre total de pages (du PDF): | 5 | ||||
DOI: | 10.2749/nantes.2018.s5-143 | ||||
Abstrait: |
BIM in bridges is a new challenge. Managing data from concept to Commission can only be done if we well understand the different phases of a project, each of them needing its own special data, its own required accuracy and specific geometry, leading to different models and often to different type of data. Transmitting common data from phase to phase must be done with a minimum loss. On the other side, it is useless to transmit data that will not be used by following phases, and an intelligent selection must be done. |
||||
Mots-clé: |
BIM
|