0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Major maintenance and strengthening of eight steel arch bridges in The Netherlands

 Major maintenance and strengthening of eight steel arch bridges in The Netherlands
Auteur(s): ,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 504-505
DOI: 10.2749/222137813806521216
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.65 MB

The Weesperbridge is one of the eight bridges in the maintenance project which will be replaced by the Contractor, in a project for major maintenance and strengthening of this steel arch bridges. F...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 504-505 Nombre total de pages (du PDF): 8
Page(s): 504-505
Nombre total de pages (du PDF): 8
Année: 2013
DOI: 10.2749/222137813806521216
Abstrait:

The Weesperbridge is one of the eight bridges in the maintenance project which will be replaced by the Contractor, in a project for major maintenance and strengthening of this steel arch bridges. For the engineering much analyzes should be made. Each analyse expects a FEM model with different level of detail. Analyzes are made of strength, fatigue and stability.

The transportation and installation of the new bridge has its restrictions. So there are the limited height of the other bridges across the Canal and the restriction to obstruct the river for a maximum of eight hours. These restrictions require an efficient and well-prepared method for the installation.

Mots-clé:
acier levage de charges lourdes