0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Long-term Dynamic Monitoring of the historic "San Michele" Iron Bridge (1889)

 Long-term Dynamic Monitoring of the historic "San Michele" Iron Bridge (1889)
Auteur(s): ,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 22-37
DOI: 10.2749/222137813806368307
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

The San Michele bridge is an iron arch bridge that crosses the Adda river about 50 km far from Milan. The bridge, built in 1889, is the most important monument of XIX century iron architecture in I...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 22-37 Nombre total de pages (du PDF): 16
Page(s): 22-37
Nombre total de pages (du PDF): 16
Année: 2013
DOI: 10.2749/222137813806368307
Abstrait:

The San Michele bridge is an iron arch bridge that crosses the Adda river about 50 km far from Milan. The bridge, built in 1889, is the most important monument of XIX century iron architecture in Italy and is still used as a combined road and railway bridge. In order to assess the structural condition of the bridge, ambient vibration tests were performed in 2009 and suggested the opportunity of installing a permanent dynamic monitoring system with Structural Health Monitoring purpose. Hence, a continuous monitoring system was designed and it is now active on the bridge since late November 2011. The paper, after a brief X of the experimental studies developed since 2009, describes the monitoring system and the software developed in LabVIEW for processing the collected data. Subsequently, the tracking of natural frequencies automatically identified until the beginning of September 2012 is presented and the effects of environmental and operational conditions on the dynamic response of the bridge are investigated.

Mots-clé:
pont en arc