Long-span Steel Truss Arch Bridge Construction and Innovation

 Long-span Steel Truss Arch Bridge Construction and Innovation
Auteur(s): , ,
Présenté pendant IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, publié dans , pp. 2086-2092
DOI: 10.2749/222137815818203962
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.12 MB

The new bridge under construction in Zhuhai, China, is a dominant project of Jinding-Gaolan road, which is the vital communication line throughout Zhuhai. The superstructure of main bridge is 100m ...
Lire plus

Détails bibliographiques

Auteur(s): (CCCC Second Harbour Engineering Company Ltd, Wuhan, China)
(CCCC Second Harbour Engineering Company Ltd, Wuhan, China)
(CCCC Second Harbour Engineering Company Ltd, Wuhan, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Publié dans:
Page(s): 2086-2092 Nombre total de pages (du PDF): 7
Page(s): 2086-2092
Nombre total de pages (du PDF): 7
Année: 2015
DOI: 10.2749/222137815818203962
Abstrait:

The new bridge under construction in Zhuhai, China, is a dominant project of Jinding-Gaolan road, which is the vital communication line throughout Zhuhai. The superstructure of main bridge is 100m + 400m + 100m steel truss tied-arch bridge. The bridge is assembled symmetrically from side span to middle span. Except for 1# segment and 2# segment of side span assembled by truck crane, all the other truss segments are assembled by 80t girder erection crane using cantilever erection method. Cable-stayed system is adopted to help mid-span arch erection and ensure safety during the whole process. After arch closure, rigid tie bar segments of mid-span can be erected by deck derrick crane. Instead of temporary flexibility tie bar, temporary locked bearing has been invented to resistant horizontal force at arch springer during rigid tie bar construction, so as to satisfy navigation requirement of first grade waterway at worksite.