0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Large-scale replacement project of Hanshin Expressway

 Large-scale replacement project of Hanshin Expressway
Auteur(s):
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 1173-1181
DOI: 10.2749/stockholm.2016.1160
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The Hanshin Expressway was first opened more than 50 years ago in 1962. It has subsequently grown into a network that boasts an operating distance of 259 km and daily traffic of approximately 700,0...
Lire plus

Détails bibliographiques

Auteur(s): (Hanshin Expressway Company Limited, Osaka, Japan)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 1173-1181 Nombre total de pages (du PDF): 9
Page(s): 1173-1181
Nombre total de pages (du PDF): 9
Année: 2016
DOI: 10.2749/stockholm.2016.1160
Abstrait:

The Hanshin Expressway was first opened more than 50 years ago in 1962. It has subsequently grown into a network that boasts an operating distance of 259 km and daily traffic of approximately 700,000 units. However, damage has manifested in the expressway because of aging of core structures. To avoid future catastrophic failures due to these damages and road closures associated with them, overall structural replacements (large-scale replacements) are planned. These replacements are planned for 6 segments of the expressway that are not expected to be improved in the future through repair and maintenance.