0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Key Techniques for Performance-based design of metro depot covered structure

 Key Techniques for Performance-based design of metro depot covered structure
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 1592-1598
DOI: 10.2749/vancouver.2017.1592
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The challenges of developing superstructures on metro train depots include abrupt changes of structural stiffness, discontinuities of vertical structural elements, out-of-current codes, different a...
Lire plus

Détails bibliographiques

Auteur(s): (TJAD Co., Ltd. Shanghai, China)
(TJAD Co., Ltd. Shanghai, China)
(TJAD Co., Ltd. Shanghai, China)
(TJAD Co., Ltd. Shanghai, China)
(TJAD Co., Ltd. Shanghai, China)
(TJAD Co., Ltd. Shanghai, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 1592-1598 Nombre total de pages (du PDF): 7
Page(s): 1592-1598
Nombre total de pages (du PDF): 7
Année: 2017
DOI: 10.2749/vancouver.2017.1592
Abstrait:

The challenges of developing superstructures on metro train depots include abrupt changes of structural stiffness, discontinuities of vertical structural elements, out-of-current codes, different architectural types, and different construction sequences. This study analyses design process of superstructures on a metro train depot in Shanghai area. The performance-based seismic design is used to design the key structural components. The laboratory shaking table tests are used to simulate seismic responses of depot and superstructure subject to earthquakes. The theoretical analysis and shaking table simulations show the superstructure and depot deformed elastically in moderate earthquakes and will not fail in strong earthquakes. The main factors affecting development of superstructure above metro train depot are analysed. The paper provides useful insights to similar projects.