Kaimai Tunnel track slab assessment

 Kaimai Tunnel track slab assessment
Auteur(s): ,
Présenté pendant IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, publié dans , pp. 545-553
DOI: 10.2749/christchurch.2021.0545
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

Kaimai Tunnel is an 8.5km long KiwiRail tunnel on one of the busiest freight rail lines in NZ North Island. The concrete base slab that supports the track slab in the drill and blast section of the...
Lire plus

Détails bibliographiques

Auteur(s): (Arup)
(Arup)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Publié dans:
Page(s): 545-553 Nombre total de pages (du PDF): 9
Page(s): 545-553
Nombre total de pages (du PDF): 9
DOI: 10.2749/christchurch.2021.0545
Abstrait:

Kaimai Tunnel is an 8.5km long KiwiRail tunnel on one of the busiest freight rail lines in NZ North Island. The concrete base slab that supports the track slab in the drill and blast section of the tunnel was cast on a fill layer rather than country rock. The fill layer has in places been washed out over time leaving voids under the base slab resulting in local track slab failures. Previous studies by others recommended major interventions or complete replacement of the track slab for the full tunnel length. This was considered impractical by KiwiRail due to the disruption to the network.

The first phase of the Arup study concluded that the trackslab could be retained subject to manageable remedial actions. A key component of this study was the interpretation that the existing paved concrete track (PaCT) and base slabs are acting as an unreinforced concrete element spanning between the side drains. Understanding the risk associated with this unintended and unusual structural form was critical in the development of the agreed remedial works. Concrete fatigue was one of the important factors investigated.

Mots-clé:
tunnel

Ouvrages et projets