Joint Iteration Method of unloaded Cable Shape and Pre-displacement of Main Cable Saddle for Long-span Suspension Bridges

 Joint Iteration Method of unloaded Cable Shape and Pre-displacement of Main Cable Saddle for Long-span Suspension Bridges
Auteur(s): ,
Présenté pendant IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, publié dans , pp. 904-911
DOI: 10.2749/istanbul.2023.0904
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.64 MB

In this paper, a new method for calculating the unloaded cable shape and main cable saddle pre-displacement in the construction of long-span suspension bridges is proposed, which is called the join...
Lire plus

Détails bibliographiques

Auteur(s): (Department of Bridge Engineering/Tongji University Shanghai, China)
(Department of Bridge Engineering/Tongji University Shanghai, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Publié dans:
Page(s): 904-911 Nombre total de pages (du PDF): 8
Page(s): 904-911
Nombre total de pages (du PDF): 8
Année: 2023
DOI: 10.2749/istanbul.2023.0904
Abstrait:

In this paper, a new method for calculating the unloaded cable shape and main cable saddle pre-displacement in the construction of long-span suspension bridges is proposed, which is called the joint iterative method (JIM). In this method, the first iteration does not require presupposing the saddle pre-displacement, and the results of the unloaded cable shape obtained in each subsequent iteration cycle will be mined to guide the saddle pre-displacement correction in the next iteration. This method uses simplified cable models and convergence conditions different from classical methods. In the simplified model of main cable mechanics, equal horizontal component of suspension bridge on both sides of main tower is taken as implicit condition, and equal unstressed cable length of each span of main cable is taken as convergence condition in iteration. Using this method, the pre-displacement of the main saddle and the unloaded cable shape of the Yingwuzhou Yangtze River Bridge is calculated by MATLAB program and compared with its designed value. The results show that this method requires few iterations and has high speed and accuracy.