The John F. Kennedy Center for the Performing Arts Expansion Project

The John F. Kennedy Center for the Performing Arts Expansion Project
Auteur(s): ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 2538-2541
DOI: 10.2749/newyork.2019.2538
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

The John F. Kennedy Center for the Performing Arts is located on the banks of the Potomac River in Washington, D.C. The Kennedy Center is home to the National Symphony Orchestra, the Washington Nat...
Lire plus

Détails bibliographiques

Auteur(s): (Silman)
(Silman)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 2538-2541 Nombre total de pages (du PDF): 4
Page(s): 2538-2541
Nombre total de pages (du PDF): 4
DOI: 10.2749/newyork.2019.2538
Abstrait:

The John F. Kennedy Center for the Performing Arts is located on the banks of the Potomac River in Washington, D.C. The Kennedy Center is home to the National Symphony Orchestra, the Washington National Opera and The Suzanne Farrell Ballet. In addition to being the nation's busiest arts facility, the Kennedy Center is also a "Living Memorial" to President Kennedy. The south expansion of the Kennedy Center, known as the REACH, provides much needed educational and rehearsal space, as well as a pedestrian link to the nearby Memorials.

The new structure combines practicality, versatility and innovation. Each surface and space created is unique, forming complex geometries and large span to depth ratios. The cast-in-place concrete structure is exposed on the interior or the exterior, including three white concrete pavilions rising out of the landscaped substructure. The pedestrian bridge connects the Kennedy Center to the river with over a 35-to-1 span to depth ratio. The REACH is scheduled to open in the Fall of 2019.

Mots-clé:
béton passerelle piétonnne