Integration of SHM at an early stage in the design and construction of long-span bridges

 Integration of SHM at an early stage in the design and construction of long-span bridges
Auteur(s): , ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 701-708
DOI: 10.2749/kualalumpur.2018.0701
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.27 MB

Automated monitoring systems are being increasingly used on long-span bridges to address a wide range of challenges, such as those encountered during the construction stage or those associated with...
Lire plus

Détails bibliographiques

Auteur(s): (Mageba SA, Bulach, Switzerland)
(Mageba Shanghai, China)
(Mageba International, USA)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 701-708 Nombre total de pages (du PDF): 8
Page(s): 701-708
Nombre total de pages (du PDF): 8
DOI: 10.2749/kualalumpur.2018.0701
Abstrait:

Automated monitoring systems are being increasingly used on long-span bridges to address a wide range of challenges, such as those encountered during the construction stage or those associated with maintenance and life-cycle optimization. Bridge designers are now more prepared than in the past to consider the use of SHM systems in their work from an early stage, and to support contractors in implementing such systems during the construction stage. Close coordination between bridge designers, contractors and SHM specialists enables the appropriate equipment to be integrated wisely in the construction process, and ensures that full advantage may be taken of the benefits that can be gained from the use of an SHM system, right from the start of the bridge’s life cycle. This can be particularly important, for example, where components of the SHM system require to be embedded in a structure’s concrete during the construction stage, or where the system will play a significant data measurement and assessment role in the construction process as a whole. This is illustrated with reference to current bridge construction projects in India and Canada.

Mots-clé:
Joint de dilatation