0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Inspection and Load Rating of P-T Segmental Bridges

 Inspection and Load Rating of P-T Segmental Bridges
Auteur(s): ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 2142-2148
DOI: 10.2749/newyork.2019.2142
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.12 MB

The interchange of the Veterans Memorial Tollway (I-355) and the Ronald Reagan Memorial Tollway (I-88) in Downers Grove, Illinois includes four post-tensioned (P-T) segmental concrete box girder br...
Lire plus

Détails bibliographiques

Auteur(s): (Ciorba Group)
(Ciorba Group)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 2142-2148 Nombre total de pages (du PDF): 7
Page(s): 2142-2148
Nombre total de pages (du PDF): 7
DOI: 10.2749/newyork.2019.2142
Abstrait:

The interchange of the Veterans Memorial Tollway (I-355) and the Ronald Reagan Memorial Tollway (I-88) in Downers Grove, Illinois includes four post-tensioned (P-T) segmental concrete box girder bridges erected with different techniques. Built in 1988, they range in length from 170m (558’) to over 610m (2,000’) on horizontally curved alignments To maintain the integrity of this vital infrastructure, the Illinois Tollway tasked Ciorba Group to perform full in-depth inspection, material testing, assessment of the P-T condition, and load rating. As part of this project we performed non-destructive testing of the P-T strands at select locations using ground penetrating radar and impact echo technology.

After the detailed inspection, the bridges were load rated taking into account the deterioration noted and using a time dependent Finite Element Analysis. We re-calculated all stresses as “locked-in” during bridge erection. The ramp bridges were load rated for the current single lane configuration as well as a potential future two lane configuration. An overall load rating and condition report was prepared which evaluated various bridge repairs and strengthening options including the use of UHPC structural overlay.