Innovative Construction Engineering for Stonecutters Bridge
|
Détails bibliographiques
Auteur(s): |
Guido Morgenthal
Robin Sham |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009 | ||||
Publié dans: | IABSE Symposium Bangkok 2009 | ||||
|
|||||
Page(s): | 8-17 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2009 | ||||
DOI: | 10.2749/222137809796068028 | ||||
Abstrait: |
With a main span of 1018m Stonecutters Bridge is the second longest cable-stayed bridge in the world. The construction of the bridge has been an unusual challenge and required innovative solutions to enable an efficient and safe erection. This paper outlines major construction engineering schemes and the solutions developed to harness the challenges of construction. |
||||
Mots-clé: |
acier béton Pont à haubans levage de charges lourdes
|