Independent Check and Validation Activities for the New Storstrøm Bridge

 Independent Check and Validation Activities for the New Storstrøm Bridge
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 88-95
DOI: 10.2749/prague.2022.0088
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.14 MB

As part of the New Storstrøm bridge Project, an Independent Check of Category 3 is being carried out by the Joint Venture sbp-MGC-A&A. The great extension of the project requires a complete checkin...
Lire plus

Détails bibliographiques

Auteur(s): (Arenas & Asociados, Madrid, Spain)
(Arenas & Asociados, Madrid, Spain)
(schlaich bergermann partner, Stuttgart, Germany)
(schlaich bergermann partner, Stuttgart, Germany)
(Moormann Geotechnik Consult, Stuttgart, Germany)
(Arenas & Asociados, Santander, Spain)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 88-95 Nombre total de pages (du PDF): 8
Page(s): 88-95
Nombre total de pages (du PDF): 8
DOI: 10.2749/prague.2022.0088
Abstrait:

As part of the New Storstrøm bridge Project, an Independent Check of Category 3 is being carried out by the Joint Venture sbp-MGC-A&A. The great extension of the project requires a complete checking team covering a great number of disciplines, including structural and geotechnical bridge design, dynamic analysis under ship impact or special construction methods.

In addition to the Independent Check activities, the Joint Venture is responsible of the Validation tasks for Banedanmark. These include an exhaustive exam of the documentation to ensure the presence of background material as well as the traceability and consistency of drawings and reports.

In the present paper, some special aspects of the independent check and validation work of the combined road and railway as a multi-span and Cable Stayed bridge will be presented.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Ouvrages et projets