Increased innovation through change in early design procedures

 Increased innovation through change in early design procedures
Auteur(s): , , ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 685-692
DOI: 10.2749/stockholm.2016.0664
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

Increasing industrial productivity and innovation is essential to meet needs to reduce lead times and costs. However, diffusion of systemic innovations in project-based industries (PBIs), such as t...
Lire plus

Détails bibliographiques

Auteur(s): (Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 685-692 Nombre total de pages (du PDF): 8
Page(s): 685-692
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/stockholm.2016.0664
Abstrait:

Increasing industrial productivity and innovation is essential to meet needs to reduce lead times and costs. However, diffusion of systemic innovations in project-based industries (PBIs), such as the infrastructure sector, has proven difficult. The Swedish Transport Administration (STA) has unique opportunity to influence the degree of innovation in the sector, due to its strong position as the largest public client of infrastructure in Sweden. Therefore, the aims of an ongoing study reported here are to identify and evaluate challenges and requirements affecting the diffusion of innovation related to this key client. This is being done by examining relevant aspects of construction infrastructure projects executed via the pre-defined design procedure currently applied by STA. The results reveal that the procedure hampers diffusion since certain activities must be performed early, is applied indiscriminately to all types of projects, and hinders inter- organizational collaboration.

Mots-clé:
innovation