Improvement of Dry Air Injection System for main cables of Seto- Ohashi Bridges
|
Détails bibliographiques
Auteur(s): |
Shigeki Kusuhara
(Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN)
Akira Moriyama (Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN) Muneo Okawa (Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN) Yoshiya Sakamoto (Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Publié dans: | IABSE Conference Geneva 2015 | ||||
|
|||||
Page(s): | 1400-1407 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2015 | ||||
DOI: | 10.2749/222137815818358745 | ||||
Abstrait: |
A “Dry Air Injection System for main cables (DAIS)” was developed by the Honshu-Shikoku Bridge Expressway Co., Ltd. (HSBE), in order to keep in sound condition of the main cables over the long term. And the DAIS was installed to the Akashi-Kaikyo Bridge as the first case in the world. In parallel with installation of the DAIS in new bridges, the HSBE also installed the DAIS in all the existing HSBE’s suspension bridges, in which progressive corrosion of the cable wires was observed. After approximately ten years of the DAIS installation, the monitoring data in the Seto- Ohashi Bridges showed that Relative Humidity (RH) of inside the cables still remained high in some portions. Through a trial and error process, we made improvements of the DAIS, which mainly composed of alteration of injection points, in order to keep RH of the entire length of the cables less than a target value (40%RH). This paper describes improvements of the DAIS and its results. |
||||
Mots-clé: |
pont suspendu
|