0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Implementation of COST Action TU1406 Quality Control framework as a part of Bridge Management System in Saint Lucia

 Implementation of COST Action TU1406 Quality Control framework as a part of Bridge Management System in Saint Lucia
Auteur(s): ,
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 833-840
DOI: 10.2749/guimaraes.2019.0833
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.79 MB

The main objective of the proposed paper is to present the applicability of the Quality Control framework developed by COST Action TU1406. Since most of the European countries have already implemen...
Lire plus

Détails bibliographiques

Auteur(s): (Tallinn University of Technology, Tallinn, Estonia)
(Sirway Ltd., Helsinki, Finland)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 833-840 Nombre total de pages (du PDF): 8
Page(s): 833-840
Nombre total de pages (du PDF): 8
DOI: 10.2749/guimaraes.2019.0833
Abstrait:

The main objective of the proposed paper is to present the applicability of the Quality Control framework developed by COST Action TU1406. Since most of the European countries have already implemented a bridge management system (BMS) and by using case studies it has been presented how novel approach can lead to more accurate decisions and connect the evaluation of existing structures to designed limit states. Opposite to European countries Saint Lucia bridge network has for many years suffered from lack of adequate maintenance, which has resulted in pronounced deterioration of the network. The situation has grown worse due to underfunded maintenance and it is therefore of utmost importance that those available funds are put to optimum use.

As a part of BMS development of Saint Lucia, an assessment method of TU1406 proposed quality control plan was used together with American Association of State Highway and Transportation Officials (AASHTO) condition rating method to make the decision-making more efficient. The BMS is developed without any initial information and for inexperienced staff, so it is fruitful to test the novel theoretical procedure in practice and compare results with widely used method.

During the investigation, on-site inspections of 71 bridges were carried out and both methods were compared regarding to implementation procedures and decision-making.

Main attention in this paper is on assessment of structures, including reported information of inspections, and comparison of maintenance decision-making based on different approaches.

Mots-clé:
ponts

Lieux géographiques