Hwayang Concrete Cable-Stayed Bridge with 500m main span
|
Détails bibliographiques
Auteur(s): |
Jung-Han Lee
Eun-Chul Lee Eu-Kyeong Cho Kyung-Ho Park Dong-Hyun Sim Kwan-Woo Park |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Publié dans: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 827-834 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/222137912805111212 | ||||
Abstrait: |
Hwayang Bridge is linking Hwayang-myeon with Jobal-do, Hwajeong-myeon of Yeosu, Jeollanam- do, Korea. Hyundai E&C was awarded the turnkey contract in May 2011, and the construction has started since December 2011. Hwayang Bridge is a concrete cable-stayed bridge with the total span of 854m, composed of a main span of 500m and side spans of 177m. It is ranked the 2nd longest concrete cable-stayed bridge in the world in terms of the main span length. PWS(Parallel Wire Strand) cables with the high strength of 1,860MPa are used and the half cylinder plate is used for the caisson installation. This paper gives brief introduction of the planning and detailed design of Hwayang Bridge, focusing on the overall structural configurations of the bridge. |
||||
Mots-clé: |
caisson pneumatique
|