0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

From the Drone to the BIM-Model - A Method for Creating As-Is Models in Bridge Construction for the Use Case of Digital Bridge Inspection

 From the Drone to the BIM-Model - A Method for Creating As-Is Models in Bridge Construction for the Use Case of Digital Bridge Inspection
Auteur(s): , ,
Présenté pendant IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, publié dans , pp. 980-987
DOI: 10.2749/manchester.2024.0980
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

The implementation of Building Information Management in bridge construction and public administration continues to progress. As part of the research project "Public Administration 4.0", a prototyp...
Lire plus

Détails bibliographiques

Auteur(s): (University of Applied Science FH Campus Wien, Austria)
(University of Applied Science FH Campus Wien, Austria)
(University of Applied Science FH Campus Wien, Austria)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Publié dans:
Page(s): 980-987 Nombre total de pages (du PDF): 8
Page(s): 980-987
Nombre total de pages (du PDF): 8
DOI: 10.2749/manchester.2024.0980
Abstrait:

The implementation of Building Information Management in bridge construction and public administration continues to progress. As part of the research project "Public Administration 4.0", a prototype for digital bridge inspection was developed for this purpose, based on the creation of BIM models of existing bridge structures. International studies attest to the method of photogrammetric point cloud generation based on drone images, for the intended use of existing bridge modelling, a high potential. In the course of a feasibility study, a creation process chain - with the drone to the BIM model - could be derived and the results generated could be considered applicable. The creation process consists of three sequential phases: as-is data acquisition, point cloud generation, and as-is modelling. The generated as-is model of the bridge can be implemented in a BIM software and used for digital bridge inspection and additional use cases.

Mots-clé:
BIM

Types d'ouvrages