0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Floating Concrete Barge Monitoring to Extend Service Life

 Floating Concrete Barge Monitoring to Extend Service Life
Auteur(s): ,
Présenté pendant IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016, publié dans , pp. 572-579
DOI: 10.2749/222137816819258924
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.25 MB

Following an overview of N’Kossa barge history of the first and unique concrete floating hull in off shore Oil & Gas industry - 220 m x 46 m x 16 m, displacement 107,000 t including 73,000 t for th...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016
Publié dans:
Page(s): 572-579 Nombre total de pages (du PDF): 8
Page(s): 572-579
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/222137816819258924
Abstrait:

Following an overview of N’Kossa barge history of the first and unique concrete floating hull in off shore Oil & Gas industry - 220 m x 46 m x 16 m, displacement 107,000 t including 73,000 t for the hull and 34,000 t for the topsides - this proceeding address the philosophy followed by TOTAL to monitor the concrete hull.

After 20 years Congo off shore, TOTAL E&P Congo intends to develop and operate for another 20 years or more new assets connected to NKP process/utility plant.

Initial hull design was done with a projected 30 years service life and the Operator faces now the issue of assessing the hull soundness and reliability for another 20 years.

A Risk Based Analysis was performed taking into account prestressed concrete behaviour with all concrete issues and loss of prestressing strength, fatigue effects, material ageing in marine environment and potential accident such as boat impact, chemical leak or fire and blast, in order to assess the potential failure modes and the associated symptoms.

Based on the results, the most sensitive areas were located and significant criteria were established. Eventually several monitoring approaches were compared and combined to provide a hull assessment tool to extend hull useful service life.

Mots-clé:
structure

Ouvrages et projets