Extension of the road bridge platform of the XIX Century
|
Détails bibliographiques
Auteur(s): |
Felipe Collazos-Arias
(Cantabria University, Santander, España)
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024 | ||||
Publié dans: | IABSE Congress San José 2024 | ||||
|
|||||
Page(s): | 462-470 | ||||
Nombre total de pages (du PDF): | 9 | ||||
DOI: | 10.2749/sanjose.2024.0462 | ||||
Abstrait: |
The purpose of this article is to develop, the history, as well as the latest actions carried out on the N-621 road, as it passes through the Hermida Gorge, in Spain, and specifically in four bridges dating back to the 19th century, to provide to these of traffic conditions within acceptable margins of road safety, and at the same time defining an action compatible with the existing environmental wealth in the whole area, substantially improving the current conditions, and with a cost widely offset by the functionality. |