0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Extended Life of Railway Bridges. Results from EC-FP7-project MAINLINE

 Extended Life of Railway Bridges. Results from EC-FP7-project MAINLINE
Auteur(s): , , , ORCID,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 314-315
DOI: 10.2749/222137813806501489
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.24 MB

There is a need to extend the life of many existing railway bridges. To facilitate this is one of the objects of the EC-FP7-Project MAINLINE, covering a period from 2011 to 2014. Three case studies...
Lire plus

Détails bibliographiques

Auteur(s):


ORCID


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 314-315 Nombre total de pages (du PDF): 8
Page(s): 314-315
Nombre total de pages (du PDF): 8
Année: 2013
DOI: 10.2749/222137813806501489
Abstrait:

There is a need to extend the life of many existing railway bridges. To facilitate this is one of the objects of the EC-FP7-Project MAINLINE, covering a period from 2011 to 2014. Three case studies are presented here in which existing bridges are being studied in order to extend their life length: First a concrete trough bridge strengthened with post stressed bars in drilled holes through the slab is considered; followed by another concrete trough bridge strengthened with sawn in Near Surface Mounted Reinforcement (NSMR) of Carbon Fibre Reinforce Polymers (CFRP); and finally a steel truss bridge which will be loaded to failure to calibrate the assessment methods.

Mots-clé:
ponts ferroviaires renforcement