Engineering the Oculus – World Trade Center PATH Transportation Hub

 Engineering the Oculus – World Trade Center PATH Transportation Hub
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 1042-1049
DOI: 10.2749/vancouver.2017.1042
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

The Oculus structure is the centerpiece of the World Trade Center PATH Transportation Hub in downtown New York City. The main structure consists of two inclined steel arches supported by steel colu...
Lire plus

Détails bibliographiques

Auteur(s): (COWI, Vancouver, Canada; Buckland & Taylor International, Inc., NYC)
(COWI, Vancouver, Canada; Buckland & Taylor International, Inc., NYC)
(COWI, Vancouver, Canada; Buckland & Taylor International, Inc., NYC)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 1042-1049 Nombre total de pages (du PDF): 8
Page(s): 1042-1049
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.1042
Abstrait:

The Oculus structure is the centerpiece of the World Trade Center PATH Transportation Hub in downtown New York City. The main structure consists of two inclined steel arches supported by steel columns, which are anchored onto cantilevers embedded in the transit hall's concrete slabs below. A segmental erection method was proposed to erect the Oculus arches, which significantly reduced the amount of temporary shoring required and allowed construction to proceed at a faster pace. During erection, a detailed geometry control procedure was developed involving multiple survey targets to ensure erection proceeded on the correct path. Bolted connections were proposed in lieu of welding in many locations to accelerate erection. The methodology for bolting such large pieces of steel was developed and designed, then optimized to achieve further schedule improvements.‌

Mots-clé:
acier architecture World Trade Center innovation

Ouvrages et projets