Engineering of a contemporary version of the stone arches of the "Pont des Trous" in Tournai
|
Détails bibliographiques
Auteur(s): |
Yves Duchêne
(Greisch Office, Liège, Belgium)
Vincent de Ville de Goyet (Greisch Office, Liège, Belgium) Frédéric Gens (Greisch Office, Liège, Belgium) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021 | ||||
Publié dans: | IABSE Congress Ghent 2021 | ||||
|
|||||
Page(s): | 1891-1899 | ||||
Nombre total de pages (du PDF): | 9 | ||||
DOI: | 10.2749/ghent.2021.1891 | ||||
Abstrait: |
As part of the works on the Seine-Scheldt link, the Scheldt is to be expanded to CEMT class Va at the Tournai crossing. The main works comprise the widening of the Scheldt river and the central arch of the historic bridge called “Pont des Trous” – “Bridge of the Holes”. The choice of replacing the bridge has gone to a triple arch in stone masonry with a main span of 20 m for a height of 15 m and a thickness of 40 cm, closer from a sculpture. Due to its very small thickness and corresponding self-weight, accurate estimation, with wind tunnel tests by University of Liège, of the wind effects is of utmost importance for the verification of masonry and especially the joints openings. Nonlinear finite element calculations considering cracking and opening of joints, using Finelg software, show that the joints should be glued to ensure the stability. Finally, by political decision, this triple arch project was abandoned and replaced by a more conventional structure. |
||||
Mots-clé: |
pont essai en soufflerie
|
||||
Copyright: | © 2021 International Association for Bridge and Structural Engineering (IABSE) | ||||
License: | Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits. |