E39 Bjørnafjorden Floating Bridge – Challenges and Solutions
|
Détails bibliographiques
Auteur(s): |
Sverre Wiborg
(COWI AS, Oslo, Norway and Copenhagen, Denmark)
Tina Vejrum (COWI AS, Oslo, Norway and Copenhagen, Denmark) Erik Sundet (COWI AS, Oslo, Norway and Copenhagen, Denmark) Per Norum Larsen (Johs. Holt AS, Oslo, Norway) Bernt Sørby (Global Maritime AS, Oslo, Norway) Rolf Åge Vågen (Global Maritime AS, Oslo, Norway) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016 | ||||
Publié dans: | IABSE Congress Stockholm, 2016 | ||||
|
|||||
Page(s): | 1896-1903 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2016 | ||||
DOI: | 10.2749/stockholm.2016.1903 | ||||
Abstrait: |
The purpose of this paper is to investigate the main challenges and corresponding solutions for a floating bridge crossing Bjørnafjorden. The paper investigates challenges related to quantification of loads, design of permanent structures as well as temporary phases. The paper evaluates a curved bridge without mooring lines, but considerations are partly valid for a straight bridge anchored to the seabed as well. Both solutions have been used, but the length of the Bjørnafjorden crossing is significantly larger than previous bridges and thus more challenging. |
||||
Mots-clé: |
pontons
|