The E39 Bjørnafjord crossing, development and selection of bridge concept

The E39 Bjørnafjord crossing, development and selection of bridge concept
Auteur(s): , , , ,
Présenté pendant IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, publié dans , pp. 420-427
DOI: 10.2749/christchurch.2021.0420
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.43 MB

The distance between Norway’s second and fourth largest cities, Bergen and Stavanger, is only 150 km. The E39 link between the cities involves as per today several ferry connections, therefore the ...
Lire plus

Détails bibliographiques

Auteur(s): (AMC (Aas-Jakobsen, Multiconsult/Johs.Holt, Cowi), Oslo, Norway)
(AMC (Aas-Jakobsen, Multiconsult/Johs.Holt, Cowi), Oslo, Norway)
(AMC (Aas-Jakobsen, Multiconsult/Johs.Holt, Cowi), Oslo, Norway)
(OON (Olav Olsen, Norconsult), Viken, Norway)
(OON (Olav Olsen, Norconsult), Viken, Norway)
(Norwegian Public Road Administration, Bergen/Oslo, Norway)
(Norwegian Public Road Administration, Bergen/Oslo, Norway)
(DNV-GL, Viken, Norway)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Publié dans:
Page(s): 420-427 Nombre total de pages (du PDF): 8
Page(s): 420-427
Nombre total de pages (du PDF): 8
DOI: 10.2749/christchurch.2021.0420
Abstrait:

The distance between Norway’s second and fourth largest cities, Bergen and Stavanger, is only 150 km. The E39 link between the cities involves as per today several ferry connections, therefore the planning of a fixed connection with bridges and subsea tunnels has been going on for some years. A major technical challenge is the crossing of Bjørnafjord, since the fjord at this site is about 5000m wide and 500m deep.

This paper describes the development of technical solutions to cross the Bjørnafjord, and the evaluation and challenges met in the different stages of the project until a preferred solution was reached in 2019. Advanced analyses and evaluations have been performed to cope with challenges like wave/wind/current interactions, ship collision, parametric excitation and subsea landslides. The work performed will provide a major contribution to future largescale strait crossings in the world.