A Dynamic Framework for Construction Scheduling based on BIM using IFC
|
Détails bibliographiques
Auteur(s): |
Jan Tulke
Mohamed Nour Karl Beucke |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008 | ||||
Publié dans: | IABSE Congress Chicago 2008 | ||||
|
|||||
Page(s): | 158-159 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2008 | ||||
DOI: | 10.2749/222137908796292119 | ||||
Abstrait: |
Construction scheduling is one of the key processes during the development of construction projects. As Building Information Models (BIM) gain more and more in importance for the design process, the scheduling process also has to be integrated into the collaborative model based working environment. For this purpose a Business Process Re-engineering approach (BPR) was applied to identify potential areas of improvement within the current scheduling and 4D simulation practice. This paper highlights the main findings and describes a novel solution approach consisting of a dynamic collaboration framework tailored for construction scheduling. Several tools were implemented to prove the new concept. The Industry Foundation Classes (IFC) are deployed to ensure open communication within the project team. Further research is ongoing within the European R&D project InPro. |