Design of multi-storey buildings for transportation

 Design of multi-storey buildings for transportation
Auteur(s): , , ,
Présenté pendant IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, publié dans , pp. 1281-1288
DOI: 10.2749/christchurch.2021.1281
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

Self-Propelled Modular Transporters (SPMT) are commonly used to lift and move relatively heavy and rigid structures such as oil platforms and bridges. The aim of this paper is to show how to design...
Lire plus

Détails bibliographiques

Auteur(s): (WSP, London& Basingstoke, UK)
(WSP, London& Basingstoke, UK)
(WSP, London& Basingstoke, UK)
(WSP, London& Basingstoke, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Publié dans:
Page(s): 1281-1288 Nombre total de pages (du PDF): 8
Page(s): 1281-1288
Nombre total de pages (du PDF): 8
DOI: 10.2749/christchurch.2021.1281
Abstrait:

Self-Propelled Modular Transporters (SPMT) are commonly used to lift and move relatively heavy and rigid structures such as oil platforms and bridges. The aim of this paper is to show how to design and analyse a conventional multi-storey building for transportation by SPMTs. The case study is the design of a major international airport pier to be built outside the secure airport perimeter and moved to its permanent airside location using SPMTs. Large scale modular construction methodologies have been adopted to maximise the reuse of the same transport beams and transporters for each module.

The benefits of this approach for this project are to ensure the majority of the construction activities can take place on a landside site rather than airside. By eliminating the security checks and subsequent transporting of workers this can save in the order of 4,000 workdays, 2,000 bus journeys and associated security and escorting costs. Furthermore the airside area of the airport is not sterilised by long term construction activities resulting in a 6 month benefit to the delivery programme.