0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Design of Kouchigawa Bridge on the Shin-Tomei Expressway - a Steel- Prestressed Concrete Composite Multiple-span Balanced Arch Bridge

 Design of Kouchigawa Bridge on the Shin-Tomei Expressway - a Steel- Prestressed Concrete Composite Multiple-span Balanced Arch Bridge
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 3451-3458
DOI: 10.2749/222137817822208627
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.27 MB

A three-span composite balanced arch structure was adopted as the river-crossing section of the bridge, using a balanced truss cantilever erection method. The arch ribs were designed as prestressed...
Lire plus

Détails bibliographiques

Auteur(s): (Central Nippon Expressway Co., Ltd., Tokyo, Japan)
(Central Nippon Expressway Co., Ltd., Tokyo, Japan)
(Central Nippon Expressway Co., Ltd., Tokyo, Japan)
(NEXCO-West Consultants Co., Ltd., Tokyo, Japan)
(NEXCO-West Consultants Co., Ltd., Tokyo, Japan)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 3451-3458 Nombre total de pages (du PDF): 8
Page(s): 3451-3458
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/222137817822208627
Abstrait:

A three-span composite balanced arch structure was adopted as the river-crossing section of the bridge, using a balanced truss cantilever erection method. The arch ribs were designed as prestressed concrete (PC) box girders and the stiffening girders were designed as steel box girders. PC box girders were also adopted on the approach spans. In order to improve driving comfort of passing traffic and minimize maintenance cost, the stiffening girders of the balanced arch are connected with the PC box girders of the approach spans without expansion joints. In order to increase the seismic resistance of the bridge, rigid connections were used at most joints between the substructures and superstructures, and between the vertical members and stiffening girders.