Design of Industrial Ring Road Project, Bangkok, Thailand
|
Détails bibliographiques
Auteur(s): |
Suravut Khamdee
Daniel John Farquhar Elljarn Jordet Raghu Nair |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009 | ||||
Publié dans: | IABSE Symposium Bangkok 2009 | ||||
|
|||||
Page(s): | 55-62 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2009 | ||||
DOI: | 10.2749/222137809796067731 | ||||
Abstrait: |
The Industrial Ring Road Project includes two crossings of the Chao Phraya River, Bangkok with cable-stayed bridges of navigation spans of 398m and 326m. The Project has three approach structures, with a central peninsula interchange which connects the west approach to the main north-south route. The interchange is located between the two main bridge structures imposing tight geometrical constraints upon both the cable-stay back spans and the interchange itself. All foundations were 1.5m diameter bored piles extending to 60m depth. The main navigation spans are of steel composite construction whereas the back spans are constructed in pre-stressed concrete. The main bridges feature slender towers with a diamond configuration. |
||||
Mots-clé: |
route des camions développement durable
|