Design & Construction of the Prai Swing Bridge
Auteur(s): |
Sashi Kumar
(Gamuda Engineering Sdn Bhd, Malaysia)
|
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018 |
Publié dans: | IABSE Conference Kuala Lumpur 2018 |
Page(s): | 905-906 |
DOI: | 10.2749/kualalumpur.2018.0905 |
Abstrait: |
This paper highlights the design and construction of the Prai Swing Bridge, a key component of the 328km long Electrified Double-Track project between Ipoh and Padang Besar in Malaysia. The bridge was built under a design & build contract completed by MMC-Gamuda JV under the purview of Keretapi Tanah Melayu Berhad (KTMB). It represents a milestone in the upgrading of the railway infrastructure network within Malaysia as part of the national push for development. |
Mots-clé: |
Pont tournant
|
Télécharger l'aperçu (fichier PDF)
0.19 MB
Publicité
Publicité
0.19 MB
- Informations
sur cette fiche - Reference-ID
10562716 - Publié(e) le:
14.02.2021 - Modifié(e) le:
21.05.2021