Design and Erection of the Arrah-Chhapra Bridge

 Design and Erection of the Arrah-Chhapra Bridge
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 540-547
DOI: 10.2749/vancouver.2017.0540
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The Arrah-Chhapra Bridge represents an evolution of bridge technology and construction processes in the Indian State of Bihar. The bridge will be an important link in the 117m-person state; increas...
Lire plus

Détails bibliographiques

Auteur(s): (McElhanney Consulting Services Ltd., Vancouver, BC, Canada)
(McElhanney Consulting Services Ltd., Vancouver, BC, Canada)
(McElhanney Consulting Services Ltd., Vancouver, BC, Canada)
(McElhanney Consulting Services Ltd., Vancouver, BC, Canada)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 540-547 Nombre total de pages (du PDF): 8
Page(s): 540-547
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.0540
Abstrait:

The Arrah-Chhapra Bridge represents an evolution of bridge technology and construction processes in the Indian State of Bihar. The bridge will be an important link in the 117m-person state; increasing the road transportation capacity over the Ganges River by 66%. The original plan called for 36 approach spans that were to be erected span-by-span as precast box girder segments, whereas the 16 navigation spans were to be cast-in-place with variable depths of up to 8m. To reduce the construction schedule, while also creating a flexible construction sequence, McElhanney Consulting Services Ltd. engineers proposed an alternative extradosed system that permitted free- cantilevering segments of only 3.4m deep; enabling multiple spans to be erected simultaneously and rapidly. Through detailed construction stage analysis, rigorous geometry control, and exhaustive efforts in the riverbed, the new bridge is entering its final stages of construction.

Mots-clé:
câble extradossé

Ouvrages et projets