0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Cracking and Fatigue of Heavy Loaded Prestressed Concrete Bridge in Sweden

 Cracking and Fatigue of Heavy Loaded Prestressed Concrete Bridge in Sweden
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 792-799
DOI: 10.2749/prague.2022.0792
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.15 MB

A prestressed concrete bridge was built in 1963 with BBRV cables. It has three spans and a total length of 134.8 m. Due to mining activities the bridge was loaded with trucks with a total weight of...
Lire plus

Détails bibliographiques

Auteur(s): (Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
(Luleå University of Technology, Sweden)
ORCID (Luleå University of Technology, Sweden)
(Swedish Traffic Administration, Luleå, Sweden)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 792-799 Nombre total de pages (du PDF): 8
Page(s): 792-799
Nombre total de pages (du PDF): 8
DOI: 10.2749/prague.2022.0792
Abstrait:

A prestressed concrete bridge was built in 1963 with BBRV cables. It has three spans and a total length of 134.8 m. Due to mining activities the bridge was loaded with trucks with a total weight of 90 ton during 2012-2014 and from 2019. Crack development has been monitored manually and from 2020 with strain gauges and LVDTs. Cracks normally vary between 0.1 to 0.3 mm in width and grow in length with time. In November 2020 some of the strain gauges on the concrete showed alarming growth and the bridge was closed for traffic. Additional strain gauges were installed on vertical reinforcement bars and an assessment was carried out of the fatigue capacity of the bridge. It was found that the new strain gauges did not indicate any growth in strain and that the fatigue capacity was sufficient. The bridge could be opened again for traffic after being closed for five weeks. Monitoring drift in the strain gauges and fatigue are discussed.

Mots-clé:
pont en béton précontraint
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.