Crack Control Technology in Construction of V-Shaped Piers of the Main Bridge of China-Maldives Friendship Bridge

 Crack Control Technology in Construction of V-Shaped Piers of the Main Bridge of China-Maldives Friendship Bridge
Auteur(s): , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 1428-1433
DOI: 10.2749/nanjing.2022.1428
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.15 MB

The piers no.19~21 of the main bridge of China-Maldives Friendship Bridge are V-shaped piers, which are constructed by the method of "cast-in-place slant legs with cable-stayed connection and hangi...
Lire plus

Détails bibliographiques

Auteur(s): (China Communications Construction Company (CCCC) Second Harbor Engineering Co., Ltd., Wuhan, Hubei , China)
(China Communications Construction Company (CCCC) Second Harbor Engineering Co., Ltd., Wuhan, Hubei , China)
(China Communications Construction Company (CCCC) Second Harbor Engineering Co., Ltd., Wuhan, Hubei , China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 1428-1433 Nombre total de pages (du PDF): 6
Page(s): 1428-1433
Nombre total de pages (du PDF): 6
DOI: 10.2749/nanjing.2022.1428
Abstrait:

The piers no.19~21 of the main bridge of China-Maldives Friendship Bridge are V-shaped piers, which are constructed by the method of "cast-in-place slant legs with cable-stayed connection and hanging section + cast-in-place block no.0 with inner supports". Based on the analysis of the whole construction stage of the bridge by the finite element method, the factors of concrete cracking during the construction of V-shaped piers are grasped. In view of the risk of structural cracks, the scheme of setting prestressed steel beam in the slant legs and accurately controlling the removal time of the cable hanging bracket is adopted to effectively prevent the concrete cracking during the construction of V-shaped piers.