0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Construction Engineering of the Kanchanaphisek Bridge

 Construction Engineering of the Kanchanaphisek Bridge
Auteur(s):
Présenté pendant IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, publié dans , pp. 29-38
DOI: 10.2749/222137809796067803
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.15 MB

The Kanchanaphisek Bridge is the fifth cable-stayed bridge to be built over the Chao Phraya River in the Bangkok Metropolitan area, and with a 500 meter long main span it is also the longest. The b...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Publié dans:
Page(s): 29-38 Nombre total de pages (du PDF): 8
Page(s): 29-38
Nombre total de pages (du PDF): 8
Année: 2009
DOI: 10.2749/222137809796067803
Abstrait:

The Kanchanaphisek Bridge is the fifth cable-stayed bridge to be built over the Chao Phraya River in the Bangkok Metropolitan area, and with a 500 meter long main span it is also the longest. The bridge is part of a 20 km long elevated highway, the Southern Outer Ring Road, which completes the Outer Bangkok Ring Road project. Building a 500 meter span cable-stayed bridge always presents the construction engineer with great challenges. This paper will present the main solutions and methods used in the construction of the longest cable-stayed bridge in South East Asia. Not only the bridge superstructure had to be erected in the shortest time possible, while not disrupting the important marine traffic on the Chao Phraya River, it also had to be built within very small tolerances to guarantee the integrity of the structure.

Ouvrages et projets