0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Construction Challenges in Super Large Double-Deck Bridges -- Minpu Bridge Construction Practice

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Publié dans:
Année: 2011
Abstrait:

The Minpu Bridge, acrossing the Huangpu River in Shanghai, is a double-deck cable-stayed bridge with main span of 708 meters, carrying 8 traffic lanes on the upper deck and 6 lanes on the lower deck . A composite truss of steel web members and fiber reinforced concrete embedded with steel frames for the upper and lower decks, is first used in a long span cable-stayed bridge. Composite truss structure, as well as all-welded connection methods for the main span, is applied. This paper presents the main features and key technologies that have been successfully studied and applied.

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10065413
  • Publié(e) le:
    03.10.2011
  • Modifié(e) le:
    05.07.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine