0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Conceptual Design of Salmon River Replacement Bridge

 Conceptual Design of Salmon River Replacement Bridge
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 1718-1725
DOI: 10.2749/vancouver.2017.1718
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

Replacing an existing narrow two-lane truss bridge constructed in 1954 with a wider modern day girder bridge while keeping the existing roadway alignment and maintaining two lanes of traffic throug...
Lire plus

Détails bibliographiques

Auteur(s): (McElhanney Consulting Services Ltd., Victoria and Vancouver, BC, Canada)
(McElhanney Consulting Services Ltd., Victoria and Vancouver, BC, Canada)
(McElhanney Consulting Services Ltd., Victoria and Vancouver, BC, Canada)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 1718-1725 Nombre total de pages (du PDF): 8
Page(s): 1718-1725
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.1718
Abstrait:

Replacing an existing narrow two-lane truss bridge constructed in 1954 with a wider modern day girder bridge while keeping the existing roadway alignment and maintaining two lanes of traffic throughout the construction period presents some interesting challenges. The Salmon River Bridge is a 180’ (54.9 m) long single span steel Pratt truss structure located approximately 27 km north of the City of Prince George on Highway 97. McElhanney reviewed a number of conceptual bridge replacement designs including single span and multi-span configurations utilizing steel and/or concrete structures and reviewed existing, upstream and downstream road alignments. After considering environmental impacts, constructability, detour requirements and the need for under bridge walkways it was decided to design and construct a new 66.5 m long single span bridge on the existing roadway alignment utilizing steel girders and a concrete to-grade deck.

Mots-clé:
acier béton pont culées tablier