0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Comparative Assessment of Bridges designed according to Balanced Lift Method and Balanced Cantilever Method

 Comparative Assessment of Bridges designed according to Balanced Lift Method and Balanced Cantilever Method
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 2592-2598
DOI: 10.2749/vancouver.2017.2592
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

In recent years a new bridge construction method has been developed at the Institute of Structural Engineering of TU Wien. The so called Balanced Lift Method can be seen as an alternative to the Ba...
Lire plus

Détails bibliographiques

Auteur(s): (TU Wien, Institute of Structural Engineering, Vienna, Austria)
(TU Wien, Institute of Structural Engineering, Vienna, Austria)
(TU Wien, Institute of Structural Engineering, Vienna, Austria)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 2592-2598 Nombre total de pages (du PDF): 7
Page(s): 2592-2598
Nombre total de pages (du PDF): 7
Année: 2017
DOI: 10.2749/vancouver.2017.2592
Abstrait:

In recent years a new bridge construction method has been developed at the Institute of Structural Engineering of TU Wien. The so called Balanced Lift Method can be seen as an alternative to the Balanced Cantilever Method.

To compare these two construction methods, an alternative design using the Balanced Lift Method for the 210 m long San Leonardo Viaduct was prepared. Starting with building the pier and the vertical installation of prefabricated elements for the compression struts and the bridge girder, the construction is ready for the lifting process. A simple way to describe this lifting process is to compare it with opening an umbrella. To create a monolithic structure, all thin wall precast elements are then filled with in-situ concrete. Finally, it can be said that for the evaluated bridge a reduction up to 30 % of the concrete mass would be possible by using the Balanced Lift Method.‌

Mots-clé:
Encorbellement Méthodes de construction pour ponts

Types d'ouvrages