Changes in Traffic Demand and Influence on the Lifetime of a 45 Year old Bridge
Auteur(s): |
Helmut Wenzel
|
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | IABSE Symposium: Responding to Tomorrow's Challenges in Structural Engineering, Budapest, Hungary, 13-15 September 2006 |
Publié dans: | IABSE Symposium Budapest 2006 |
Page(s): | 25-33 |
Année: | 2006 |
DOI: | 10.2749/222137806796185689 |