0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Challenges with Building the Longest Suspension Bridge in South America - Overview of Issues – The Owner’s Perspective

 Challenges with Building the Longest Suspension Bridge in South America - Overview of Issues – The Owner’s Perspective
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 2808-2815
DOI: 10.2749/vancouver.2017.2808
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The Chacao Bridge is the first major bridge project in Chile, and when built it will be the largest suspension bridge in South America. The 2,750 m-long structure will connect the island of Chiloé ...
Lire plus

Détails bibliographiques

Auteur(s): (Ministerio de Obras Públicas, Santiago, Chile)
(Ministerio de Obras Públicas, Santiago, Chile)
(Ministerio de Obras Públicas, Santiago, Chile)
(COWI North America Ltd., Vancouver, BC, Canada)
(COWI A/S, Copenhagen, Denmark)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 2808-2815 Nombre total de pages (du PDF): 8
Page(s): 2808-2815
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.2808
Abstrait:

The Chacao Bridge is the first major bridge project in Chile, and when built it will be the largest suspension bridge in South America. The 2,750 m-long structure will connect the island of Chiloé with mainland Chile across the Chacao Channel. The three-tower suspension bridge will have main spans over 1 km in length each. The design faces many challenges related to the environment where the bridge is located; high seismicity, high wind, volcanos, tsunamis, sea waves, and potential erosion of the central island (Roca Remolinos) and the shores.

This paper presents the design and construction challenges for the project from the Owner’s perspective. Also, it discusses the interaction within the project team: owner (MOP), owner's engineer (RyQ and COWI NA) and the construction JV working together for successful delivery of this high profile project.

Mots-clé:
design pont suspendu

Ouvrages et projets

Types d'ouvrages

Lieux géographiques