Challenges when enhancing the infrastructure – case studies

 Challenges when enhancing the infrastructure – case studies
Auteur(s): , ,
Présenté pendant IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, publié dans , pp. 1313-1322
DOI: 10.2749/ghent.2021.1313
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

The fundamental rational of the German way to ensure structural safety and to prevent the society from undue harm is independent design review and execution supervision. This paper will explain bot...
Lire plus

Détails bibliographiques

Auteur(s): (Technical University Munich, Munich, Germany / Hertle Ingenieure, Gräfelfing, Germany / BVPI e.V., Berlin, Germany)
(University of the German Armed Forces Munich, Munich, Germany‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌)
(University of Applied Sciences Karlsruhe, Germany / BREHM Bauconsult GmbH, Bensheim, Germany / BVPI e.V., Berlin, Germany)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Publié dans:
Page(s): 1313-1322 Nombre total de pages (du PDF): 10
Page(s): 1313-1322
Nombre total de pages (du PDF): 10
DOI: 10.2749/ghent.2021.1313
Abstrait:

The fundamental rational of the German way to ensure structural safety and to prevent the society from undue harm is independent design review and execution supervision. This paper will explain both regarding the way in which review and supervision are performed, as well as the qualification needed for the design and supervision review engineer, who acts as a trustee of the public administration. The development of the review and supervision regime and of the underlying set of technical rules and regulations will be addressed by discussing actual and historic case studies. Special emphasis will be put on the interface-problems when different parties are involved and on the necessity of good and reliable coordination mechanisms between the involved parties. As a consequence of the increasing fragmentation of the design process in combination with the use of complex software tools and inevitable time pressure often the integrated design review process is the last line of defence to avoid incidents due to minor lapses or serious misjudgements.